Custom Brass Pressure Gauge Adapter
Custom Brass Pressure Gauge Adapter made to drawing, with connection geometry, material, inspection and supply scope confirmed before quotation.
View drawing checklist
Custom brass gauge adapters, sockets and sensor connections made to your drawing, with thread, bore, sealing interface and inspection requirements reviewed before quotation.
Start with the gauge or sensor interface and the process connection. The product family describes drawing-based component types; it is not a list of stocked parts with universal pressure ratings.
Identify the instrument-side and process-side threads separately. Include the complete thread designation and size from the mating drawing, such as NPT, BSPP or BSPT; a label saying only BSP needs clarification. Show the sealing location and any required seal or washer.
State bore, shoulder and wrench-clearance requirements; mark critical dimensions on the drawing revision.
Include the medium, working conditions, material requirement and inspection scope in the quotation request.

These are manufacturing starting points rather than fixed catalog ratings. Your approved drawing controls the final part.
Custom Brass Pressure Gauge Adapter made to drawing, with connection geometry, material, inspection and supply scope confirmed before quotation.
View drawing checklistPressure Gauge Socket made to drawing, with connection geometry, material, inspection and supply scope confirmed before quotation.
View drawing checklistSensor / Transmitter Adapter made to drawing, with connection geometry, material, inspection and supply scope confirmed before quotation.
View drawing checklistInstrument Manifold Block made to drawing, with connection geometry, material, inspection and supply scope confirmed before quotation.
View drawing checklistAdapters, sockets and connection bodies reviewed around thread, bore, sealing interface and instrument integration.

Material, pressure, temperature, media compatibility, testing and compliance remain project-specific until reviewed.
Send the available information. Missing technical decisions are identified before quotation.